Nationwide Boiler Literature - Case Studies - Electrical Power Generation

Superheat, Low NOx Boiler Used for Start-up

Nationwide Boiler Case Studies - Electrical Power Generation Summary
Superheat steam supply
Low NOx and CO
Occasional use
Salt-air environment
Cost-effective solution
Fast turn-around
Background
One of the largest fossil-fuel based, electric-power-generating facilities in the U.S. is operated by PG&E Company at Moss Landing, California. Two oil-fired boilers provide steam to two steam turbines which, in turn, drive two 750 megawatt generators. When a system is taken off line for maintenance, superheat steam is required during the system restart.

Problem
Occasionally, both boilers that provide steam to the two turbines at the Moss Landing facility must be taken off line at the same time. When this occurs, an auxiliary steam supply capable of providing 700 F steam is needed to pre-heat the system and draw a vacuum on the condensers. Because of the strict environmental standards, emissions produced by any boiler used for this purpose must not exceed 25 ppm NOx and 50 ppm CO.

Solution
A 55,000 lb/hr, 700 F package boiler was available in stock at Nationwide Boiler's Fremont, California facility. Although this boiler had sufficient capacity and met the steam temperature and pressure requirements, it did not meet the current NOx and CO emission limits of the Monterey Bay area. The boiler was retrofitted with a new QLN low NOx burner manufactured by Coen Company of Burlingame, California. After installing the new burner, the boiler was fully tested at the Nationwide Boiler test facility. Because of the salt-air environment and since plans call for using this boiler only twice each year on aver-age, special protection was provided. This protection consists of all NEMA 4X electrical enclosures and panels, Sealtite conduit, special priming and exterior paint, and a dry nitrogen blanket system that maintains a positive pressure of 10 inches of water inside the boiler. The protective inert-gas environment is used whenever plans call for the boiler to be out of service for an extended period.

Results
Sixteen weeks after the contract was awarded, Nationwide Boiler delivered the complete, fully tested boiler system with the low NOx burner. The boiler was installed with the support of Nationwide Boiler technicians and is currently available for service whenever needed to support start-up procedures. Actual emissions fell well below the required limits. Third-party source tests confirmed levels of 15 ppm NOx and 10 ppm CO at full-load conditions.

Equipment Used
Skid-mounted 55,000 Ib/hr 700 F package boiler
Coen Company QLN low NOx burner

 

    In This Section: Brochures Product Bulletins Case Studies Green Solutions Press ReleasesPublications Steamlines Newsletter Videos  
spacer_blue

Home | About Us | Contact | Employment | Site Map
Emergency | Rentals | Sales | Equipment | Green Solutions | Literature / Media | Customers | Manufacturers | Request Form
info@nationwideboiler.com - 42400 Christy Street, Fremont, CA 94538
Copyright © 2008 Nationwide Boiler Inc.
(800) 227-1966

blue_spacer